Loading...
PA9702-LR 990827GROUT COMPRESSI(L' STRENGTH TEST 8901 Carpenter Frwy., Suite #10O Dallas, Texas 75247 Date of Service: 08/18/1999 Report No.: 9922456 Report Date 08/2711999 Client No.: COPPELL Project No.: 94991118 Client: CityofCo pell Project: CoppcllAquatic/RecreationCtr Attn: Bra~PReid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. 4/96051 Services: Sample grout from delivery vehicle, cast 3" x 3" x 6" prisms in accordance with the recommendations of ASTM C 1019. PROJECT DATA CONTRACTOR: Hisaw & Assoc. GROUT CLASS: GROUT SUPPLIER: TXI PLACEMENTDATE: 08/18/1999 BATCH TIME: 12:15pm PLANT: On-site TIME SAMPLED: 12:45pm nv: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 2500 psi @ 28 Days TEMPERATURE (F) - AIR 100 F GROUT: 104 F TRUCK NO: N/A TICKET NO: N/A TEST METHOD: PLACEMENT LOCATION: LineF, 7.Sandl SAMPLE LOCATION: E/1 at course #7 SAMPLE SIZE: 3" X 3" X 6" REPORT OF TESTS PRISM MEASURED MAXIMUM COMPRESSIVE MAiD SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (IMi) I 1 11.00 08/25/1999 7 66640 4880 1 2 11.00 09/15/1999 28 1 3 11.00 09/15/1999 28 NOTE: See report #992441 for technician time. Tee..,c,..: Oreg Dimock StartS: Report Distribution: ( 1 ) City of Coppell ( I ) City of Coppe I1 - Engineering (I) BrinkIcy Sargent Architects (I) City ofCoppell - Bldg. lnsp. Etl~ FIarbonr ( 1 ) Turner Engineers ( l ) City of Coppell - Leisure Scrv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 09TIMP Page 1 of I