Loading...
SS9901A-CS021111T N E C 1 T Y O F COPPELL yYu! y~ SI~ T ~1.~ f~ Q E 8 ~ ~ - 0 q November 11, 2002 Ryan Roberts Centex Construction, Inc. 1201 E. Sandy Lake Rd. Coppell, TX 75019 fax 972-471-1499 RE: Deforest Force Main SS 99-01 Walk-thru Dear Mr. Roberts: Please be advised that awalk-through has been scheduled for Thursday, November 14, 2002 at 10:00 a.m. for the sanitary sewer facilities in the referenced project. Please ensure that all manholes are pumped out and accessible at that time and that C-Con Services, Inc. representatives (James or Dale) are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call 972-304-7090 at your earliest convenience. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, Director of Engineering & Public Works Glenn Hollowell, Asst. Director of Public Works Ted Dutt, Utility Operations Manager Forrest Henderson, Centex C-Con Services, Inc. fax 972-243-5227