LETTER OF TRANSMITTAL
Garreth Campbell Reference:
The City of Coppell Date: November 11, 2002
P. O. Box 9478 Project St. Joseph Village
Coppell, TX 75019 Name:
We are sending X Attached _ Under Separate Cover These are transmitted as checked below:
Vla _ the following items:
_ FOR APPROVAL _ Approved
_ Shop Drawings _ Prints Return of Submittal _ Approved as Noted
_ Copy of Letter _ Change Order Request X For Your Use _ Return for Conec[ion
_ Samples _ Specifications _ As Requested _ Revise and Resubmit
_ Submittals _ Drawings _ Review & Cowmen[ _ Rejected
_ Quotation
2 11/11/02 City of Coppell change order #1 signed originals.
Please review by
Copies To: File Enclosure
Signed +~'~
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT: ST. JOSEPH'S VILLAGE
CONTRACTOR: ST. JOSEPH'S VILLAGE, INC.
OWNER: City of Coppell
CHANGE ORDERNO.: ONE (1) DATE: 11/7/02
Description
ADD:
1. 39" RCP w/Headwalls
2. Bonds/Insurance Adjustment for 39" RCP w/ Headwalls
Total Addition
DELETE:
3. 30" Sanitary Sewer Force Main Credit
(Change in Subcontractor)
4. 18" RCP
5. Inlets
Total Delete
Total Revision to Contract Amount
Total
$43,000
$2,544
$45,544
($41,541)
($2,176)
($4,540)
($48,257)
($2,713)
Previous contract amount $692,845
Net decrease in contract amount ($2,713)
Revised contract amount $690,132
The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full
accord and satisfaction of all past and future liability originating under any clause in the Contract by
reason of this revision to the Contract.
I!-b~;
Date
~o by Contractor
by Owner
i/ /~O ~
P
/a
Date
AREA
Excavation & UtilityContractors, lnc.
P.O. Box 423
Mansfrea, texas 7606:1
MEi'RO: (817) 417-9700
FAX: (817) 417.9600
October 24, 2002
Centex Construction Co.
1201 East Sandy Lake Rd.
Coppell, Texas 75019
Attn: Forrest
Re: St. Joseph Village
Coppell, Texas
Subj: Storm Drainage
Area Excavation & Utility Contractors,Inc. propose to furnish
the necessary labor, equipment and materials to perform the
following scope of work
'Storm Drainage:
1. Furnish and install 39" RCP Class III
with Cement sand bedding
2. Remove existing headwall
3. Poured in place 42" headwall with
safety end treatment
4. Poured in place 42" headwall for
double barrel 39" pipe with safety end
treatments
5. Fnrnieh.and install 18" RCP Class III
with standard embedment
6. Poured in place 6• curb inlets
7. Tie into existing 66" RCP Yith 18"
8. Trench Safety _ •
Exclusions:
1. No Layout
2. No lab testing
Approx 166LF
1 each
1 each
1 each
Approx 86LF
2 each
2 each
Approx 252LF
Total Amount: X43,000.00