Loading...
St Joseph-CN021111CENTEX CONSTRUCTION COMPANY 1201 E. Sandy Lake Road Coppell, Texas 75019 LETTER OF TRANSMITTAL Garreth Campbell Reference: The City of Coppell Date: November 11, 2002 P. O. Box 9478 Project St. Joseph Village Coppell, TX 75019 Name: We are sending X Attached _ Under Separate Cover These are transmitted as checked below: Vla _ the following items: _ FOR APPROVAL _ Approved _ Shop Drawings _ Prints Return of Submittal _ Approved as Noted _ Copy of Letter _ Change Order Request X For Your Use _ Return for Conec[ion _ Samples _ Specifications _ As Requested _ Revise and Resubmit _ Submittals _ Drawings _ Review & Cowmen[ _ Rejected _ Quotation 2 11/11/02 City of Coppell change order #1 signed originals. Please review by Copies To: File Enclosure Signed +~'~ CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: ST. JOSEPH'S VILLAGE CONTRACTOR: ST. JOSEPH'S VILLAGE, INC. OWNER: City of Coppell CHANGE ORDERNO.: ONE (1) DATE: 11/7/02 Description ADD: 1. 39" RCP w/Headwalls 2. Bonds/Insurance Adjustment for 39" RCP w/ Headwalls Total Addition DELETE: 3. 30" Sanitary Sewer Force Main Credit (Change in Subcontractor) 4. 18" RCP 5. Inlets Total Delete Total Revision to Contract Amount Total $43,000 $2,544 $45,544 ($41,541) ($2,176) ($4,540) ($48,257) ($2,713) Previous contract amount $692,845 Net decrease in contract amount ($2,713) Revised contract amount $690,132 The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. I!-b~; Date ~o by Contractor by Owner i/ /~O ~ P /a Date AREA Excavation & UtilityContractors, lnc. P.O. Box 423 Mansfrea, texas 7606:1 MEi'RO: (817) 417-9700 FAX: (817) 417.9600 October 24, 2002 Centex Construction Co. 1201 East Sandy Lake Rd. Coppell, Texas 75019 Attn: Forrest Re: St. Joseph Village Coppell, Texas Subj: Storm Drainage Area Excavation & Utility Contractors,Inc. propose to furnish the necessary labor, equipment and materials to perform the following scope of work 'Storm Drainage: 1. Furnish and install 39" RCP Class III with Cement sand bedding 2. Remove existing headwall 3. Poured in place 42" headwall with safety end treatment 4. Poured in place 42" headwall for double barrel 39" pipe with safety end treatments 5. Fnrnieh.and install 18" RCP Class III with standard embedment 6. Poured in place 6• curb inlets 7. Tie into existing 66" RCP Yith 18" 8. Trench Safety _ • Exclusions: 1. No Layout 2. No lab testing Approx 166LF 1 each 1 each 1 each Approx 86LF 2 each 2 each Approx 252LF Total Amount: X43,000.00 Tha , txo .,, .. ,