Loading...
ST9304-CS021113MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works From: Larry Davis, Construction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 Date: November 13, 2002 RE: WALK -THRU for Belt Line Road (ST 93 -04) Utilities A final walk -thru for utilities on the referenced project has been scheduled for Thursday, November 2151 at 9:00 a.m. Please meet me at the Riverside Church of Christ parking lot located at 150 E. Belt Line Rd. (west end of Belt Line near intersection with Denton Tap Rd.) Please let me know if I can be of further assistance. cc: Teresa Turner, E.I.T. Suzan Taylor, CIP Coordinator John Mears, P.E., Dallas County Dept. of Public Works fax 214 - 653 -7057 Brad w/ Zachry Construction Corp. fax 972 - 228 -0412 "CrrY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"