ST9304-CS021113MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
From: Larry Davis, Construction Inspector
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date: November 13, 2002
RE: WALK -THRU for Belt Line Road (ST 93 -04) Utilities
A final walk -thru for utilities on the referenced project has been scheduled for
Thursday, November 2151 at 9:00 a.m. Please meet me at the Riverside Church
of Christ parking lot located at 150 E. Belt Line Rd. (west end of Belt Line near
intersection with Denton Tap Rd.)
Please let me know if I can be of further assistance.
cc: Teresa Turner, E.I.T.
Suzan Taylor, CIP Coordinator
John Mears, P.E., Dallas County Dept. of Public Works fax 214 - 653 -7057
Brad w/ Zachry Construction Corp. fax 972 - 228 -0412