Loading...
Freeport NIP(7.9)-LR021107REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Concrete Age: 62 days Average Strength: 5140 psi Core Location: REPORT OF CONCRETE CORES Uline Facility Freeport Parkway Coppell, Texas Core Number Cored Length (inches) Capped Length (inches) Core Diameter (inches) LID Ratio LID Corr Factor Total Load (Ibs) Corrected Compressive Strength PSI 1 2 3 6.0 5.9 5.7 5.4 5.3 5.2 3.75 3.75 3.75 1.427 1.400 1.387 0.9504 0.9480 0.9456 59960 60160 59600 5160 5160 5100 1) 10' W of center approach. 2) 12' W of core #1. 3) 6' south of core #2. Comments: Core obtained to evaluate in place strength of were below project specification. Considering 85 percent of design strength, the concrete is American Concrete Institute Standards. Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn Chandler- Thomas, Inc.! Ms. Diane Coulson (1) City of Coppell /Mr. Larry Davis (1) City of Coppell /Mr. Lee Stone REE L7 GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 114 REPORT DATE: 11 -07 -02 REG PROJECT NO. 9056 DATE CORED: 10 -24 -02 DATE TESTED: 10 -31 -02 TECHNICIAN: S. Davis PAGE: 1 of 1 concrete where 28 day cylinders the average strength exceeds considered acceptable by Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT KEA/cn fi 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 1EL [214) 350 5600 FAX [214) 350 0019 EnGInEE G R O U P