St Joseph-CS020612~T s ~ Ps
TRANSMITTAL
AGUlRRE CORPORATION
12700 PARK CENTRAL DR FLOOR 15
DALLAS TEXAS 75251
FAX 972 78B 1583
PHONE 972 788 1508
THE CAN-DO SPIRIT THAT GETS THE JOB DONE®
DATElTIME: June 12, 2002
PROJ. NO.:
ro: City of Coppell PROJ. NAME:
cor„pany Engineering Department
Address' 255 Parkway
city, state. zp Coppell TX 75019
1030009900/0300
St. Joseph Village
^ FedEx
® Hand Delivered
^ US Mail
ATTN: Mr. Ken Griffin
DELIVERY VIA:
RE: Civil Construction Drawings for Phase 1A
___ _ _ _ _______ _. m.._m___.. __.
If enclosures are not as noted, kindly notify us at once.
ARE SENDING YOU ®Attached
^ Under separate cover via
^ Shop drawings ®Prints
^ Copy of letter ^ Field Log
the following items:
^ Plans ^ Samples ^ Specifications
^ Field Order ^ Change Order _ Other
COPIES DATE NO. DESCRIPTION
1 Civil Construction Drawings for Phase 1A
1 Previous submittal of Civil Construction Drawings for
Phase 1 A with Ci review comments
1 Previous submittal of Civil Construction Drawings for
Storm Sewer Lines "E" and "A" with City review
comments
THESE ARE TRANSMITTED as checked below:
^ For Council Approval ®For review and approval ^ Revise and Resubmit
^ For your use ^ Reviewed ^ Rejected
^ As requested ^ Furnish as corrected ^
REMARKS Ken, the attached prints ref-ect most of the revisions listed in the City's previous
review comments. We have also included a copy of the City's comment letter with
our annotations regarding each item. Under separate cover on June 13, 2002, we
will request use of the HDPE storm sewer pipe on site and the thickened pavement
for the fire lanes in lieu of lime stabilization.
COPY TO
SIGNED:
J. Michael Millican; P.E.
Form # (Rev. 1100) \WGUIRRE\DATAWAI-PROJ\1030\0099-00\Documents\TRANSMT06'1202.doc
Page 1 of 1