Loading...
DR0002-MP021107ID Task Name 1 DESIGN PHASE 2 Dee p 3 Ad ettleemant 4 Bid Opening 5 CRY Coundl 8 RIGHT-OF-WAY 7 Dion 8 Drainage Eands (2) 8 Acquired 10 Abandonarant(1) 11 RE Brown 12 Drainage EwM (1) 13 Acquired 14 Abandonment (1) 15 CONSTRUCTION 18 Notice to Proceed 17 Construction (work days) 18 Construction (over wok days) MEADOWCREEK DRAINAGE PROJECT DR ODO2 O'Brien Engineering, Inc. _ Qtr 3,2= 1 Qtr 4, 2 001 _ Qtr 1 Jun Jul Aug — Sep --- -- Oct rNov I Dec . _Jar . 10130 A D . 9124 A 8129 D A 9126 Qtr 2, LMar _ Apr_ Project: DR 00-02 Task Milestone Sum Dote: Thu 11!7172 ^ Deadline f l Page 1 MEADOWCREEK DRAINAGE PROJECT DR 00-02 O'Brien Engineering, Inc. 16 Nodes to Proceed Contractor to tats delivery of pre -cast box culvert the first week in March 20D2. 17 Ca buctlon (work days) WEEK 1(Mar. 29 - 26) Contractor has not mobfted. WEEK 2 (Apr.1 -5) Contractor has not moNfizsd. WEEK a (Apr. I -13) Contractor has not mob&W. WEEK 4 (Apr. 16 -1s) Contractor has not mobilized. WEEK 6 (Apr. 22 - 26) Contractor has not mobilized. WEEK 6 (Apr. 26 - May 3) Contractor Is clearing site and staking centerline of the culvert. Started the Installation of the box culvert on the downstrean end. WEEK 7 (May 6 -10) Contractor Is Installing the boot culvert. Completed the tie-in to the existing 544nch pipe. May need to realign the headwall to avoid eroding an existing bank - Inspector Is talking with the property owner. WEEK I (May 12 -17) Property owner does not want to lose tree that would be lost if the headwall is realigned. Contractor poured headwall as shown on the plans. Started placing the fill and hauling In the rock rip rap. Hauled off the debris from the site. WEEK 5 (May 20 - 24) Contractor Is continuing to piece the fill. WEEK 10 (May 27 - 311 Contractor is contirwkng to place the fill. Contractor placed some of the handrail. WEEK 11 (June 3 -7) Handrail plates did not fit the headwall. Headwall had to be repaired. Constructed manhole and grate inlet. WEEK 12 (June 10 -14) Contractor placed bop soil and completed find grading. Placed temporary ralling and 84 nch rock rtp-rap. WEEK 13 (hare 17.21) WEEK 14 (June 24-28) Handrail eat, added rock rip -rap and hydro- mulched. WEEK 15 (JWy 1 a) Contractor had problem with erosion and added addlfional material. WEEK 15 (JULY 242) WEEK 17 (JULY 111-19) Page 2 MEADOWCREEK DRAINAGE PROJECT DR ODO2 O'Brien Engineering, Inc. MEEK ti JULY 22-28) Correcting Rem noted In the fkW walk- Uwough. September 10, 2002 - Letter sent to contractor requaetkV him to correct several Remy so that the contract could be closed. September 16, 2002 - Letter sent to contractor stsdnp that Coppell had paid all R could pay under the terms of the contract. Gress has not been established - too We to seed with Bermuda. Page 3