Loading...
SW0001-MP021107ID I Task Name - -- - - - - -- — 1 1 DESIGN PHASE 2 Design 3 Advertisement 4 Bid Opening 5 City Counch B RIGHT-OFMAY 7 City of Irving 8 Response Received 9 Approved 10 Dallas Water Utilities 11 Approved 12 TXU Electric 13 Response Received 14 Response Received 15 Aapdred by City 16 Lot 11 River Ridge Addition 17 Acquired by City 18 HOA River Ridge Addition 19 Acquired by City 2D CONSTRUCTION 21 Notice to Proceed 22 construction RIVERCHASE SIDEWALK SW OD-01 PACHECO KOCH ENGINEERING !tr 3, - 2001 _ —_- Qtr 4,,2001 Qtr 1, 2002 Qtr 2, 20 Qtr 3,:2X)2 - - _ Qtr 4 2002 _ Qtr_1 � 2003 Jul AuQ_ j _8ep Oct Nov Dee Jan [ Feb Nlar AprTMay [ Jun JuI j Aug See - Oct �Nov_I Dec Jan Feb Mar 1014 . 12110 1a10 A 512 818 1018 4 (� 9130 ♦ 1 © Project: SW OD-01 Task Milestone . Summary ^ Deadline .1 Date: Thu 1 1171)¢ Page 1 RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING 4 Oeslgn On October 9, 2001 TXU decided riot to approve the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission lines. Wonting with TXU to resolve issue. 7 City of kvktg First request sent on September 12, 2001. Seoond Mw send wkh revised plans on May 7, 2002. 0 Response Received City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement. 10 Dallas Water UUNdes First War sent on Sepbnber 12, 2001. Second letter send with revised plans on May 7, 2002. 12 TXU Electric TXU denied request for use of sea~. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20 2002 which provided acceptable area for the crossing of the TXU easements. City Gerd letter March 22 with exhibit showing two options for the sidewalk layout. U Resporua Racelved Did not approve the permit. 10 Raapoma RGcdvGd Old not approve the permit. 16 Acquired by City September 9, 2002 - TXU requested revised PIK wrong pope number. PKCE revised. Page 2