ST9304-CS 901209 COPPELL PUI{LIC WORKS
MEMORANDUM
DATE: November 19, 1990
TO: Steven G. Goram, Director of Public Works
VIA: M. Shohre Daneshmand, Acting City Engineer ,. -% ..... .
FROM: Larry Davis/'~o~}[~ction Inspector
East Beltline Project From MacArthur Boulevard
to City Limit (A- Active Project)
(Tickler 11-19-90)
As requested, the information listed is a cost estimate for the proposed
installation of traffic detection loops in the westbound traffic lanes in
Beltline Road at MacArthur Boulevard.
QtV- Material Unit Price Total Cost
5 Traffic pull boxes installed $225.00 $1,125.00
3 6 X 20' Traffic loop including saw cut 250.00 750.00
1 6 X 40' Traffic loop including maw cut 400.00 400.00
1 6 X 30' Traffic loop including saw cut 350.00 350.00
130' 4" P.V.C. Conduit including bore 15.00 1,950.00
30' 3" P.V.C. Conduit including bore 12.50 375.00
80' 2" P.V.C. Conduit in open trench 4.00 320.00
270' Lead-in cable from pull box to
controller .60 162.00
Total Estimated Cost $5,432.00
This project was designed by Ginn, Inc. and is being built by the Dallas County
Department of Public Works with cost participation by the City of Coppell.
A~ of November 1, 1990, the drainage system was 98% complete. The eastbound
pavement lanes are complete and the westbound lanes and medians are 30% complete.
The overall project is approximately 60% complete. The completion date projected
by the Dallas County Department of Public Works is mid-January of 1991.
Upon your direction, and availability of such funds, we will coordinate the