Loading...
ST0102-CS021113November 13, 2002 T H ar . (2 I T Y · 0 F COPPELL Tiseo Paving Company David Dendy 419 E. Hwy $0 Mesquite, TX 75150 RE: Ruby Road Project #ST 01-02 Dear Mr. Dendy: At the November 12, 2002 City Council meeting, the referenced project was awarded to your fimi. Enclosed with this letter are three original contract documents. Please execute the three originals; provide the required bonds and return two of the originals at the preconstmction conference. One of the copies is for your file. The preconstmction conference on the referenced project has been scheduled for Monday, November 25, 2002 at 2:00 p.m. in the second floor conference room at Town Center, 255 Parkway Blvd., Coppell, Texas. If you have any questions feel free to call Suzan Taylor, CIP Coordinator at 972/304-7019 or Crarreth Campbell, the inspector on this project, at 972/304-3685. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Suzan Taylor, CIP Coordinator Garreth Campbell, Inspector Larry Davis, Inspector Rick O'Dell, Inspector Kevin Jay Canafax, Rone Engineers Fax 214/630-9819 Jim Phillips, Oneor 214/875-2266 David Frey, Verizon Communications Fax 972/434-0913 Jack Evans, Pacheco Koch Fax 972/235-9544 Brook Barefoot, Duke Realty Fax 972/361-6800