PA9702-LR 990826 MORTAR COMPRESSr VE STRENGTH TEST
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 08/18/1999 Report No.: 9922441 Report Date
08/26/1999
Client No.: COPPELL Project No.: 94991118
Client: CityofCo pell Project: CoppellAquatic/RecreationCtr
Attn: BrahPReid
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppell, Texas/Prj. #96051
Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast
compressive strength samples (2" x 2" x 2" cubes).
PROJECT DATA
CONTRACTOR: Hisaw & ASSOC. MORTAR CLASS: Type S
MORTAR SUPPLIER: TXI PLACEMENTDATE: 08/18/1999 BATCH TIME: 12:30pm
PLANT: On-site TIME SAMPLED: 1:00pm BY: Greg Dimock
SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Clear
STnEr~GTH: 1800 psi @ 28 Days TEMPERATURE (F) - AIR 100 V MORTAR: 104 V
TRUCK NO: N/A TICKET NO: N/A
TEST METHOD: ASTM C]09 PLACEMENT LOCATION: F Line, 7.8 Line & #1 Line
ASTM C270
SAMPLE LOCATION: Line F/6.5 at course #8
SAIVtPLE SIZE: 2" x 2" x 2"
REPORT OF TESTS
CUBE MAXIMtrM COMPRESSIVE
MARKED DATE AGE LOAD STRENGTH
SET NO. TESTED (days) (Ibs. force) (psi)
1 1 08/25/1999 7 6990 1750
1 2 09/15/1999 28
1 3 09/15/1999 28
Technician: Greg Dimock Started: 11:30pm Finished: 2:00pm I'~E~ inc.
Report Distribution:
Tths report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, [nc.
08TMP Page 1 of 1
] '[~ ]l '~ I I