Loading...
PA9702-LR 990826 MORTAR COMPRESSr VE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/18/1999 Report No.: 9922441 Report Date 08/26/1999 Client No.: COPPELL Project No.: 94991118 Client: CityofCo pell Project: CoppellAquatic/RecreationCtr Attn: BrahPReid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast compressive strength samples (2" x 2" x 2" cubes). PROJECT DATA CONTRACTOR: Hisaw & ASSOC. MORTAR CLASS: Type S MORTAR SUPPLIER: TXI PLACEMENTDATE: 08/18/1999 BATCH TIME: 12:30pm PLANT: On-site TIME SAMPLED: 1:00pm BY: Greg Dimock SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Clear STnEr~GTH: 1800 psi @ 28 Days TEMPERATURE (F) - AIR 100 V MORTAR: 104 V TRUCK NO: N/A TICKET NO: N/A TEST METHOD: ASTM C]09 PLACEMENT LOCATION: F Line, 7.8 Line & #1 Line ASTM C270 SAMPLE LOCATION: Line F/6.5 at course #8 SAIVtPLE SIZE: 2" x 2" x 2" REPORT OF TESTS CUBE MAXIMtrM COMPRESSIVE MARKED DATE AGE LOAD STRENGTH SET NO. TESTED (days) (Ibs. force) (psi) 1 1 08/25/1999 7 6990 1750 1 2 09/15/1999 28 1 3 09/15/1999 28 Technician: Greg Dimock Started: 11:30pm Finished: 2:00pm I'~E~ inc. Report Distribution: Tths report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, [nc. 08TMP Page 1 of 1 ] '[~ ]l '~ I I