ST0001-AG021022T x Z • ° I * • • ° • DEPT: Engineering/Public Works
AGENDA REQUEST FORM COPPELL DATE: October 22, 2002
" a ITEM #: 18
ITEM CAPTION:
Consider approval of Change Order #4 for the Creekview Drive and a portion of Freeport Parkway Project
#ST 00 -01, in the amount of $126,028 to Infrastructures Services, Inc; and authorizing the City Manager
to sign. APPROVED BY
CITY COUNCIL
ON ABOVE DATE T A
GOAL(S): '
EXECUTIVE SUMMARY:
to Approve
- Peters
- Raines
5 -0
dt Tunnell absent
In an effort to final the Creekview Drive project several issues needed to be resolved. Change Order #4 should
take care of those issues and allow us to complete the project.
Staff recommends approval of Change Order #4 in the amount of $126,028 to Infrastructures Services, Inc.
Staff will be available to answer questions at the Council meeting.
FINANCIAL COMMENTS: The funds required for this change order are available in the 2000 GO Street CIP
fund.
DIR. REVIEW: FIN. REVIEW: CM REVIEW:
o...E
Agenda Request Form - Revised 09/02 Document Name: #eng2 -1AR
CITY OF COPPELL
CHANGE OR EXTRA WORK ORDER
PROJECT. CREEKVIEW DRIVE PROJECT # ST 00-01
CONTRACTOR: INFRASTRUCTURE SERVICES, INC.
OWNER: CITY OF COPPELL
CHANGE ORDER: # 4
DATE. 10122102
ADD:
Item
Quantity
Unit
Description
Unit Price
Total Price
New
1
LS
Disposal of excess dirt not shown on
58,075.00
58,075.00
construction plans
New
1
LS
Disposal of excess dirt associated with the
14,125.00
14,125.00
sidewalk design not shown on construction
plans
New
1
LS
Extra mobilizations due to phasing not
18,504.00
18,504.00
shown on construction plans
New
1
LS
Loss of efficiency associated with required
18,092.00
18,092.00
phasing
New
1
LS
Installing and maintaining temporary roads
9,792.00
9,792.00
due to phasing
New
1
LS
Maintaining barricades due to required
7,440.00
7,440.00
phasing
TOTAL ADDITION
$126
TOTAL CHANGE ORDER #4 $126,028.00
Original Contract Amount $190409811.47
Contract Amount including Change Order #1 (- $189050) $1,0229761.47
Contract Amount including Change Order #2 ($1,459.13) $19024,220.60
Contract Amount including Change Order #3 ($17,180.15) $190419400.75
Total Change Order #4 $ 126,028.00
Revised Contract Amount $19167,428.75
Change Order #4
Pagel
Net Increase in Contract Time of Completion
Revised Contract Time of Completion
102 Days
267 Days
The contractor hereby accepts this contract adjustment as a final and complete adjustment in
full accord and satisfaction of all past and future liability originating under any clause in the
Contract by reason for this revision to the Contract.
AL� 4A- tO 1.
Recommended t t ity Engineer Date
U--
Change Order #/4
Page2
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Mayor and City Council
From: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works
Date: October 22, 2002
RE: Consider approval of Change Order #4 for the Creekview Drive and a portion
of Freeport Parkway Project #ST00 -01 in the amount of $126,028 to
Infrastructures Services, Inc.; and authorizing the City Manager to sign.
On August 21, 2001 the City of Coppell opened bids for the construction of Creekview Drive.
Twelve bids were received and the low bid was from Infrastructures Services, Inc. in the amount
of $1,040,811.47. My cost estimate for the project was 1.6 million dollars. The bid was awarded
to Infrastructures Services, Inc. (ISI) on September 18, 2001.
During the course of construction, two distinct issues arose that have led to ongoing negotiations
and discussions with the contractor on how best to resolve those issues.
The first issue deals with the disposal of excess dirt on the site.
Shortly after beginning construction, it became apparent that the construction plans did not
reflect the actual field conditions. There was a substantial amount of dirt within the right -of -way
of Creekview Drive, along the south side of Wagon Wheel Park, that needed to be relocated
before the street could be constructed. During discussions with Schrickel, Rollins and
Associates, Inc. concerning this issue, it was noted that no real "on the ground" survey was
performed prior to the design of the plans. The survey information on the plans was taken off of
aerial photography obtained when Schrickel, Rollins and Assocs. was designing Wagon Wheel
Park for the City of Coppell. The Engineering Department chose Schrickel Rollins because they
were the City's consultant on Wagon Wheel Park and it was my opinion that there needed to be
strong interface between Creekview Drive and Wagon Wheel Park. While one division of
Schrickel, Rollins and Assocs. was designing the park, another division of Schrickel, Rollins and
Assocs. was designing Creekview Drive for the City. During the time the aerial photography was
flown to the time the project was under construction, a large amount of dirt was moved from the
Wagon Wheel Park site to what would become the right -of -way of Creekview Drive. That dirt
was not reflected on the construction plans, therefore, during construction it was a changed
condition.
There were discussions with the contractor on how to approach this issue. However, the
contractor was instructed to proceed with the work. We did allow the contractor to dispose of the
excess dirt on the Heatley -Moist property to fill a low area adjacent to Freeport Parkway.
However, even accessing that location necessitated the removal of some trees and fences.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
• The second issue deals with the phasing of construction.
The construction plans did not show any phasing to be associated with this project. The bidder
assumed that they would have the opportunity to close down Ruby Road at Freeport Pkwy and to
prohibit through traffic on Freeport Pkwy during the time that the section of Freeport Pkwy. was
being constructed from Creekview Drive to the entrance to Wagon Wheel Park. However, to
facilitate traffic to the park it was not feasible to close access to the park site along Freeport
Parkway. Therefore, the contractor was required to maintain appropriate barricading, traffic
control, etc. to insure that access was provided along Freeport Parkway and Ruby Road at all
times. This not only resulted in additional cost to the contractor, but also resulted in a very
elongated construction time for a small portion of the project that was associated with Freeport
Parkway from Creekview Drive to the entrance of Wagon Wheel Park. The resolution of this
issue has been discussed for some time between the City of Coppell and the contractor.
The project is now nearing completion and in actuality the last remaining item is to close out the
financial side of the project. To that end, a meeting was held on October 1, 2002 with the project
superintendent, contract manager and the president of ISI from Houston. The president of ISI
presented the City with eight separate and distinct changes to the project totaling $233,778.63.
Needless to say, the meeting between the City of Coppell and ISI was at times very direct and
heated concerning these eight requests.
I have reviewed the eight requests and in my opinion two of the eight are not valid. However, the
other six requests do have some validity and deserve some attention as to compensation. The
two requests that I have rejected are as follows:
1. Work associated with accessing the Heatley -Moist property to dispose of the referenced
excess fill. I rejected this request as the offer of the Heatley -Moist property as a place to
dispose of excess excavation was actually a benefit to the contractor. The value of that
request was $17,894.94.
2. Compensation of $52,620.37 for the field supervisor for an additional 112 days on the project
that was lengthened by the phasing. There are other requests associated with the phasing of
the project that actually deal with material and loss of efficiency. It was my opinion that to
compensation the field supervisor over and above that for 112 additional days was not a valid
request.
The following represent the six requests that in my opinion have some validity as to
compensation:
1. Removal of the excess dirt offsite. As previously stated, that dirt was not reflected on the
construction plans. The original request was for $68,121.98 and the mark -up (for profit and
overhead) was $10,046.98. I eliminated all mark -up for additional compensation from the
request. Therefore, it is my opinion that this item should be compensated in the amount of
$58,075.00.
2. Extra excavation related to the installation of the sidewalk. The actual location of the
sidewalk was not determined prior to the start of construction. It was generally shown along
"CrrY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
the north side of the project, but was attempted to be incorporated into the Wagon Wheel
Park and the Tennis Center. Again, while laying out the final sidewalk design additional dirt
was encountered. As previously stated, that dirt was placed in the right -of -way after the
aerial contour information was obtained to design the project. The original request was for
$18,041.01 and the mark -up was $3,916.01. Therefore, it is my opinion that this item should
be compensated in the amount of $14,125.00.
The next four requests deal with phasing of the project:
3. Extra mobilization necessitated by numerous move -ins for phasing purposes. The original
request was for $23,332.84 and the mark -up was $4,828.84. Therefore, it is my opinion that
this item should be compensated in the amount of $18,504.00.
4. Loss of efficiency associated with the paving along Freeport Parkway due to the phasing
requirements. The original request was for $30,081.23 and the mark -up was $11,989.23.
Therefore, it is my opinion that this item should be compensated in the amount of
$18,092.00.
5. Installing and maintaining temporary roadways within the phased areas that were not shown
in the construction plans. The original request was for $14,286.53 and the mark -up was
$4,494.53. Therefore, it is my opinion that this item should be compensated in the amount of
$9,792.00.
6. Maintaining the barricades for the additional days associated with the phasing. The original
request was for $9,399.72 and the mark -up was $1,959.72. Therefore, it is my opinion that
this item should be compensated in the amount of $7,440.00.
The total value of this requested change order is $126,028 or 12% of the bid.
There is available money still within the bond program for this project to cover the additional
compensation for this change order.
Staff recommends approval of Change Order #4 in the amount of $126,028 to ISI. Staff will be
available to answer questions at the Council meeting.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"
Description: Tree and dirt hau&v Into pond area
LABOR Rog" Orerrne
prys Rarte Hours Hours TOW
Operator 2 10 $ 16.00 8 $2,560.00
Labor 2 10 $ 12.00 8 $1,920.00
EQLAPMENT .. y
Q D Rate Tow
Doer 1 10 S 350.00 / $3,500.. Roller compactor 1 10 $ 325.00 RENTALS
MATERIALISUPPL ES
I Unit
Qty
MAI uw
E
a -
12ejv.4 -ed
SUBCONTRACTORS
unit
Qty
9ROO oW
Trucking
hrs
48
40.00 Et, .00
s
s -
s -
,, .00
4,480.00
Burden
55%
2,464.00
Markup
15
E 672.00
ub -Total
E 7,616.00
$ 6,750.00
Markup
15%
$ 1,012.50
ub -ToW
$ 7,762.50
$
X
15%
$
u otal
E
$ 1,920.00
15%
$ 288.00
ub-TOW
$ 2,208.00
2%
$15,422.86
ub•ToW
$ 308.45
tal Price
1 .
IM
Field Supervisor
EGUIPMENT
112 to pickup
RENTALS
MATEIVALISUPPUEs
Port -a -toilet
SUBCONTRACTORS
BurW 55% $14,784.00
Markup 15% $ 4,032.00
Sub-Total $45,696.00
Equipment $ 4,928.00
M 15% $ 739.20
Sub.T $ 5,667.20
Materials, Supplies
$ 196.00
15% $ 29.40
Sub-Total
S 225.40
Subcontractor$
$
15% $
Sub -Total
$
Bond
2% $51,588.60
Sub-Tow
S 1,031.77
MCM.37
Total Price
S -
S -
5 -
S
Resi4e4
lz )
Request for Change Order
Project: qty d CappM C "ew and Freeport Parkway fir RFl
Deacmipliocce Dirt Haul OR
LABOR
a -
S -
ECMF%IENr Daily
D Rate TOW
HE Loader 1 40 $ 3257 $13,000.00
S -
RENTALS
$ -
i -
S-
MATERIALSUPPLIES Unit Qty Price TOW I 0 I
Trucking Iva 1163 35.00 $40,705.00 ' \
dump fees LS 1 4370.00 $ 4,370.00
/ J
SUBCONTRACTORS Unit Qty Price TOW
S -
i -
S -
=J
Base Labor
a
Burden
55% 5
Markup
15% $
Sub -ToW
$
Equipment
$13,000.00
Markup
15% $ i lSo-60'
Sub-Tow
$14,950.00
Materials, Supplies $ 45,075.00
15% i ia94 f5�
Sub-Total $ 51,836.25
Suboantradom $
15% $
Sub -ToW $
Bo 2% $66,786.25
Sub-Tow $
Total Prtoe :Kf- S r Q S
Request for Change Order
K;j Cigr of Coppel Ce*~ and Freeport Parkway Rs: RR
Desorlptlors: E*a Excavation
LABOR
Foreman
Labor
Operator
RENTALS
MATER4WSUPPUES
SUBCONTRACTORS
Tnrddnp
Total Prim
®1/
Unit Qty Price Total
S -
S -
Unit Qty Price Total
hm 144 40.00 $ 5,780.00
S -
S -
S . ✓ /
55% $ +,670.'80'
15% $ - 428:48"
$ 4,855.20
$ 5,509.00
15% S -kWvr�
$ 8,335.35
S -
15% $
S -
$ 5,780.00
15% $ -8et'9C
S 8,824.00
2% S 11,323.03
S -4ww'
# 1 4 ,lls
4f 1 1�5'
�2
Rapulr Overtime
oty Days Rata Hours Fours ToW
1 7 $ 25.00 8 $ 1,400.00
1 7 $ 12.00 8 $ 872.00
1 7 $ 14.00 8 S 784.00
Burden
Markup
Sub -Total
Equipment
Markup
Sub -Tatol
Materials, Supplies
Sub-ToW
Subcontractors
SubToW
Band
Sub-ToW
Total Prim
®1/
Unit Qty Price Total
S -
S -
Unit Qty Price Total
hm 144 40.00 $ 5,780.00
S -
S -
S . ✓ /
55% $ +,670.'80'
15% $ - 428:48"
$ 4,855.20
$ 5,509.00
15% S -kWvr�
$ 8,335.35
S -
15% $
S -
$ 5,780.00
15% $ -8et'9C
S 8,824.00
2% S 11,323.03
S -4ww'
# 1 4 ,lls
4f 1 1�5'
�2
Rapulr Overtime
oty Days Rata Hours Fours ToW
1 7 $ 25.00 8 $ 1,400.00
1 7 $ 12.00 8 $ 872.00
1 7 $ 14.00 8 S 784.00
Request for Change Order
Project CRY of CoppN Ceekview and Freeport Parkway Re: RM
Desodpgoa: Extra MobRzefion Due to phasing riot shown in plans
LABOR
Regular Overtlrre
CAY Days Rate Hours Hours TOW
Forerrrun 1 6 $ 25.00 a s 1.200.00
Labor a 6 $ 12.00 a $ s,304.00
t s,aa.00 ✓
EQUIPMENT Wy
p Rete Total
s -
RENTALS
s -
C
MATERIAUSUPPUES Unit MY Price Told $ 163350
-
$
SUBCONTRACTORS Unit Qty Price Tafal
urne SLIboortactor as 3 5000.00 $ 15,000.00
s -
s -
$ - ✓,
t 16,000.00
Burden 55% $ t KI20 6 0
Markup 15% $ -527E0"
Sub-Total $ 5,956.80 4 °2 60
Equipment $
Markup 15% $ -
SubTctal $
s
15% $
Sub-Tctsl
S -
Subcontractors
$15,000.00
Sub -ToW
15% $ -tY56:Oe'
$17,250.00
C9'
Bond
2% $ 6,301.80
S
$ -42"r
TOW Prins
c� ,t
4 18 SOA
Request for Change Order
Protect City d COMW CeekWew and Freeport Parkway lie. RIM
Descripdgm labor Inefficiency
LABOR
Foreman
Labor
Finisher 1 Fonnsetter
ECI 11PMENr
Power Screed
Delivery of Screed
RENTALS
MATERIALISUPPLJES
Delivery of screed
SUBOONrRACTORS
Burden
Markup
Sub -ToW
Equipment
Markup
Sub-Total
Materials, supplies
Sub -TOW
Sub-Total
Bond
Sub-ToW
Trial Prlae
r ummXX
.00 ✓
Unit City Price Total I
EA 5 110.00 S 550.00
s Vol,
Unit CAY Price TaW
S - / -
S -
S -
55% $ 6:685:'66
15% $ e7m-S
$ 26,846.40
$ 1,750.00
15% $ *SLL! '
S 2,012.50
$ 550.00
15% $ -Ga 36'
$ 632.50
S -
5% $
S -
2% $ 29,491.40
$ -66!1'83'
13 2
�4
Few omeme
Rafe Hours Hours Trial
1 14 $ 30.00 8 $ 3,360.00
3 14 $ 12.00 8 $ 4,032.00
5 14 $ 15.00 8 $ 8,400.00
Order
Description Install, Rene, aid Maintain Base Material
LABOR
Regular overt:m
Oty Days Rate Haas Haas Total
Operator 1 24 $ 14.00 8 $ 2.888.00
Libor 1 24 $ 12.00 8 $ 2,3D4.00
i a,t>s2.00
EQUIPMENT
Daly
Qly
�aY
Rate
Total
�,
1
2a
$ 237.00
$ 5,886.00
RENTALS
RollerCampactor
1
1
$ 900.00
Q
$ 900.00 9-N2.
_ '
Water Truck
1
1
$ 1,500.00
$ 1.500.00
$ $400.00 ✓ f S
l
MATERlAUSUPPLIES
Unit
Tats)
Qty
Price
Flex Base
kls
20
120.00
$ 2 400.00
i 2.400.00 ✓
SUBCONTRACTORS
Unit
Taw
CAY
Price
55% $ w
Marlap 15% $ *46.W
Sub-Toted $ 8,486.40
Equipnent $ 2.400.00
Makup 15% $ -88M
Sub -TOM $ 2,760.00
Materials. Supplies $ 2,400.00
15% $ -86m
Sub -TOW $ 2,760.00
s,eoontr cm,s $ -
15% $ -
Sub-Toted $
Bond 2% $14,006.40
Sub- Total $ 288.1T
Total Prim i *4=Lvr ,q2
Description: Barricades and M**wmr ce
LABOR Rapular OwrWne
Frets Supervisor
EQUIPMENT
RENTALS
MATERWIJSUPPLIES
SUBCONTRACTORS
Barricade Subcontractor
Rate Mores Ha+s Tdal
1 16 S 30.00 3
$ 1,440.00
$
i -
S -
S -
1,440.00 t,/
O
M Price Cial
S -
S -
S
Und °la
mo 4 1500.00 S 8,000.00
S -
S -
$
6.000.00 ✓
—�
Burden
55% S - 7!!2.90
Markup
15% i 4".1w
Sub-Total
$ 2,418.00
Equlxnent
$
Me"
15% i
Sub-Total
$
Meledals. Supplies
$
15% $
Sub-Total
$ -
SuboartradcM
$ 8.000.00
15% S lI80'00
Sub-Totol
$ 8,900.00
Bond
2% $ 2,588.00
Sub -Total
i 4sr7e-
T
Total Price
1 440
- 7 . 4+0
(b)