SS9901A-LR020712IN-PLACE DENSITY TESTS
ENGINEERING. INC.
a division of Tcrracon
8901 Carpenter Frwy., Suite 100
Dallas, Texas 75247
Client:
Project: ~ Y~_.:~/b - ~ ~/~ :?
Moisture/Density Relationship: Standard
Select Fill General Fill
Material Description L/~ ~- "~'
2.
Optimum
Moisture
%
Date:
Project No.:
Report No.:
Modified
Density Project Requirements
(PCF) Moisture Density
Test
NO.
FIELD DENSITY TESTS
Test Location
Probe Lift/
Depth Elev.
([ r¸
M/D Moisture
No. (%)
Dry Density Density
(pcf) (°/°max)
/?/?. 7 ~ :- 7
Complies except where noted (*).
Standard Count: Moist '~0 g'~ Density: /-/~ ~
Gauge No.: Z 0 ? 7
Contractor Notified of Results: Yes ~ No
Name of Person:
404
Technician:, ~- ~{/~
Start: '~ ~ ~C~W~oPI
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wfltt~n approval of HBC Engineering, Inc.