Loading...
SS9901A-LR020712IN-PLACE DENSITY TESTS ENGINEERING. INC. a division of Tcrracon 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Client: Project: ~ Y~_.:~/b - ~ ~/~ :? Moisture/Density Relationship: Standard Select Fill General Fill Material Description L/~ ~- "~' 2. Optimum Moisture % Date: Project No.: Report No.: Modified Density Project Requirements (PCF) Moisture Density Test NO. FIELD DENSITY TESTS Test Location Probe Lift/ Depth Elev. ([ r¸ M/D Moisture No. (%) Dry Density Density (pcf) (°/°max) /?/?. 7 ~ :- 7 Complies except where noted (*). Standard Count: Moist '~0 g'~ Density: /-/~ ~ Gauge No.: Z 0 ? 7 Contractor Notified of Results: Yes ~ No Name of Person: 404 Technician:, ~- ~{/~ Start: '~ ~ ~C~W~oPI This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wfltt~n approval of HBC Engineering, Inc.