Loading...
SS9901A-LR020722IN-PLACE DENSITY TESTS ENGINEERI]~, INC. a division of Terracon 8901 Car~nter Fray., Suile 100 Client: Moisture/Density Relationship: Standard Select Fill General Fill Date: Project No.: Report No.: Modified Material Description 2. q~/o'2,'/97 . ~0o/ Optimum Moisture Density % (PCF) /7,6, /~. ~ Project Requirements Moisture Density FIELD DENSITY TESTS Test NO. Probe Lift/ M/D Moisture Test Location Depth Elev. No_..~. :... ': ~ ~ ,'..~/ /,/~ ~ / ~. / Dry Density Density (pcf) (%max) Complies except where noted (*). Standard Count: Moist -~ ,~ ~ Density: li ~ ? Technician: Gauge No.: '2 0'7 7 Start: J Stop: Contractor Notified of Results: Yes '~//' NO Name of Pemon: ~[? r t' ,-- ~' 404 This report is e~clusively for the use of the client indicated above and shall not be mproducad in full without written approval of HBC Engineering, Inc.