Loading...
SS9901A-LR020801IN-PLACE DENSITY TESTS ENGINEEEING. INC. a division of Terracon Client: Project: ..~-<~/. %b_r' o~ '~ Moisture/Density Relationship: Select Fill Material Description 1. ~:~'1o?/t ~"3 , 2. ~'~/,~'~ //~? , Test NO. Standard General Fill Optimum Moisture % Date: ~///0 2_ Project No.: ~./e 2 I/~ -I Report No.: ¢9c~//~ -~ Modified Density Project Requirements (PCF) Moisture Density ton ~ - /~ ~ 9-~ ~- FIELD DENSITY TESTS Test Location -- O.d ¢£ - Probe Depth Lift/ M/D Moisture Dry Density Density Elev. .o~ (O/o) (pcf) --~' j___~ zt.'7 ,:,q. 7 .~,' j_.__~ ~' /.5 ?e. ¢' ! Complies except where noted (*). Standard Count: Moist ~8 ~ ~ Density: ~'?~_ Gauge No.: Technician: .~:,'- &. Start: ~ Stop: Contractor Notified of Results: Yes ~ No Name of Person: '~:Z,~- ~ ~( O:,,,'-u~l I 404 Th;s report is exclusively for the use of the client indicated above and shall not ha reproduced n fu w thout written approval of HBC Engineering, Inc.