Loading...
SS9901A-CS020509 (2),, CENTEX CONSTRUCTION COMPANY 3100 McKinnon 7th Floor Dallas, TX 75201 P.O. Box 199117 Dallas, TX 7b219 Phone: 214 488-4700 Fex: 214 486-4387 May 9, 2002 Kenneth M. Griffin, P.E. The City of Coppell P. O. Box 478 Coppell, TX 75019 Re: St. Joseph Village Subj: Revise Force Main Deaz Mr. Griffin, P.E.: We aze submitting, herewith, our Request for Change Order (Proposal) # 0001 in the amount of One Hundred Twenty Three Thousand One Hundred Eight Three Dollars (5123,183) to install the 30" Force Main across the St. Joseph Village property in accordance with the fma! revised drawings from Turner Collie Braden dated March 6, 2002. Our attached proposal revised 5/9/02 covers the changes to the specific work as set forth in the attached Proposal breakout and as identified as revisi~ from the conhzct proposal based on the Turner Collie Braden drawings dated November 2001. Please execute the pertaining to this 1 Accepted by: Accepted Witt ity Manager City of Coppell Sincerely, -~--~ Antho auchne/~~ ~~~ ~~ val Form and return to us as soon feel free to reach us our office at 2 Should there be questio 1. Village, Inc. OUR VISION T ....r. .. r. _._.r,...,, ,.r ~w..,.......,, s:.. d.., /`.,.,...,.,.n.,,, L.duen„ in rh., Mnrknlc uw rvn~r. 17:12 CENTER O!'>rSTRIlCTION -DAL 972 233 2911 P.83/03 Install 30" Sanitary Sewer Force Mafn Rsvisea atuntities srtio2 ae~is.d Prioinq 5f9ro2 Scope of Work• Itwtssd per Install a 2,022 If Tamer CoNk 30" ductile iron Braden drnwings n Epoxy Lined date 3/6ro2 main mi I for ca accordance with phns. Csseriptlon Qty Unit Unit price lJne Total 30" CL51-D.I. Pipe 6 - 8' Cut 40 rc 598.50 13,940 30" CL51-D.1. Pipe B' -10' Cut 1298 if 5108.50 Sf40,833 30" CL51-D.I. Pipe 10' -15 Cut 567 N 5157.00 573,319 Bore 30" sewer 217 if 1275.00 559,675 Air Release Valves 3 ea 52.450.00 57,350 Bends 14 ea 16,200A0 586,800 30• Plugs 3 ea 52.900.00 58,700 Trench Safety 2022 If 51.50 53,033 resting zoz2 n s1.so s3,o33 30" Gate ValvefAccesaories 1 ea 526,800.00 SZ8,800 Btlnd Flanges 3 ea 54,240.00 512,720 Surveying 1 !s 54,800 subtotal San Saba (Utility Subcontractor) Prios C 5!9102 (515,000) =54fe~U~s Subcontractor Payment and Performance Bond 18,320 subtotal - 4;3 ~ ® General Conditions subtotal 18,000 =Sa3~ Casualty insurance 0.7908% 53,419 Builder's Risk Insurance 0.07% 5303 subtotal ~-34~B~c Centex Payment and Performance Bond 1.596 ' 10 - subtotal ' 8;044` °'~4 General Contractor's Fee 4.096 517,442 ToMI X6'1 ' Current Contract Amount ~~g ~•--- - SllBTOTAL 11a1,387 Cost Adjustment by St. Joseph Vlllags, I SJ9roZ `~ 118,184 Net Change Order 1123,183 S ; ,^^ y. t~~ . ~b tti ~,,,~ a ~. k1n.- v~~ S i w. D V 2 l l t 0 5 T' 0 T GQ- a e.Q~~°~~.. ~ 1 h c.Rfase S s+ s~ ~ - i3 1r33 . ~ ~ ~O~ ,~•- cos ~ ) ~ ~c ~ w,A ,~.._ .-,3_~ ~ .1 1 G 4 30 ~ ---- - -- ~ Z ~, , ,