Loading...
MA FY 0001-LR020415Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Alley paving from 105 to 101 Dobecka LOCATION OF POUR SET 2: 15 April 2002 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 964 Cement Ticket No. 7115435 Flyash Time Batched 8:50am Sand Time Sampled 9:45am in. Concrete Temp. IASTM C10641 68°F in. Air Content IASTM C231) 4.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C143) ps1 Strength 217 2.00 218 2.00 219 2.00 220 2.00 221 2.00 222 2.00 7 04/22/01 114,600 4050 7 04/22/01 114,500 4050 14 04/29/01 130,8Q0 4630 14 04/29/01 130,900 4630 28 05/13/01 147 ,Q00 5200 28 05/13/01 14~,8Q0 5309 28-Day Average 57~50 4000 TECHNICIAN: DISTRIBUTION: CBC (9:00am-11:00am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148