Loading...
MA FY 0001-LR020404Hooper Engineering Laboratories, Inc. Conatruction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Alley paving from 233 to 237 Simmons LOCATION OF POUR SET 2: 4 April 2002 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 947 Cement Ticket No. 7115175 Flyash Time Batched 11:27am Sand Time Sampled 12:15pm in. Concrete Temp. (ASTM C1064) 64°F in. Air Content (ASTM C231) 4.9% Water Unit Weight (ASTM C13e) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 211 4.50 212 4.50 213 4.50 214 4.50 215 4.50 216 4.5O 7 04/11/01 108,200 3830 7 04/11/01 114,200 4040 14 04/18/01 116,600 .41;Z0 14 04/18/01 1:[8,500 4190 28 05/02/01 151,700 5370 28 05/02/01 152,300 5390 28-Day Average $380 4000 TECHNICIAN: DISTRIBUTION: CBC (11:45am-1:45pm) (2) Nova Construction Co., inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Tex~a ?5229 (214) 351-6419 Fax (214) 351-5148