Loading...
MA FY 0001-LR020403Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 3 April 2002 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf ~ 10.0% Moisture LOCATION PROCTOR LIFT Alley Paving Replacement ~ 237 Simmons 134) approx. 25' south of north end 1 135) approx. 125' south of north end 1 136) approx. 30' north of south end 1 MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % Fin. Sub. 8.8 124.3 99.5 Fin. Sub. 7.8 119.7 95.6 Fin. Sub. 7.7 128.9 103.1 REQUIRED COMPACTION % 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas ?5229 (214) 351-6419 Fax (214) 351-5148