MA FY 0001-LR020326Hooper Engineering Laboratories, Inc.
Construction Materials Testing ·
REPORT OF CONCRETE TESTS JOB NO.:
CLIENT: Nova Construction Co., Inc. DATE:
PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER:
LOCATION OF POUR SET 1: Paving at alley north of 427 Clear Creek
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MiX NO.
Truck No. 955 Cement
Ticket No. 7114742 Flyash
Time Batched 8:46am Sand
Time Sampled 9:40am in.
Concrete Temp. (ASTM C1064) 58°F in,
Air Content IASTM C231) 5.1% Water
Unit Weight {ASTM C~3S) Admix //1
Admix #2
AEA
42
26 March 2002
Lattimore
COMPRESSIVE STRENGTH TESTS cASTM C391
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
{ASTM C143) psi Strength
205 5.50 7 04/02101
206 5.50 7 04/02/01
207 5.50 14 04/09/01
208 5.50 14 04/09/01
209 5.50 28 04/23/01
210 5.50 28 04/23/01
88,40O 3130
98,100 3470
102,600 363Q
3-02,9OO 3640
116,20Q 4110
117 ~500 4160
28-Day Average 4140
4000
TECHNICIAN:
DISTRIBUTION:
MFM (9:00am-11:O0am)
(2) Nova Construction Co., Inc.
(1) City of Coppell, Garreth Campbell
2870 Walnut Hill lane Dallaa, Taxa8 75229 (214),351-6419 Fax (214) 351-5148