MA FY 0001-LR020311Hooper Engineering Laboratories, Inc.
CLIENT:
PROJECT:
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
Nova Construction Co., Inc.
2001 City of Coppell Street & Alley Repair, Job 21076
MATERIAL DESCRIPTION:
1) Cement Treated Base
1) 125.0 pcf @ 10.0% Moisture
MOISTURE
ASTM D 698 STANDARD PROCTOR:
LOCATION PROCTOR LIFT CONTENT
%
DATE: 11 March 2002
Alley Replacement (~ 407 Clear Creek Lane
128) approx. 50' south of north end 1
129) approx. 150' south of north end 1
130) approx. 50' north of south end 1
DRY PERCENT REQUIRED ·
DENSITY COMPACTION COMPACTION
PCF % %
Fin. Sub. 8.8 122.3 97.8
Fin. Sub. 8.6 121.1 96.8
Fin. Sub. 7.4 131.9 105.5
95+
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co., Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148