Loading...
MA FY 0001-LR020213Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 13 February 2002 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Alley at 1002 Rolling Brook. Cylinders made on alley approach to Timber Ridge Lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Nova Cement Ticket No. 7113317 Flyash Time Batched 8:14am Sand Time Sampled 9:38am in. Concrete Temp. (ASTM C1064l 57°F in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 187 6.25 188 6.25 189 6.25 190 6.25 191 6.25 192 6.25 7 02/20/01 95,700 3390 7 02/20/01 101,200 3580 14 02/27/01 .~12 ,OQQ 3960 14 02/27/01 1Qg,60Q 3880[ 28 03/13/01 127,50Q 45.~0 28 03/13/01 128,500 4550 28-Day Average 4530 4O00 TECHNICIAN: DISTRIBUTION: RDG (9:00am-11:00am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 13 February 2002 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base 123) 124) ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf @ 10.0% Moisture LOCATION PROCTOR LIFT Alley Paving Reolacement 329 Clear Haven north section ' south section MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 Fin. Sub. 10.2 1 Fin. Sub. 10.5 125.5 100.4 122.7 98.2 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148