Loading...
MA FY 0001-LR020201Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving, alley patch behind 106 London Way LOCATION OF POUR SET 2: I February 2002 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 834 Cement Ticket No. 3140030 Flyash Time Batched 10:42am Sand Time Sampled 11:20am in. Concrete Temp. (ASTM C10641 61 °F in. Air Content (ASTM C231) 2.8% Water Unit Weight (ASTM C138} Admix //1 Admix//2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 181 6.00 7 02/08/01 182 6.00 7 02/08/01 183 6.00 14 02/15/01 184 6.00 14 02/15/01 185 6.00 28 03/01/01 186 6.00 28 03/01/01 97,300 3440 97,500 3450 105,500 3730 106,500 3770 123,200 4360 121,700 4300 28-Day Average 4330 4000 TECHNICIAN: DISTRIBUTION: CBC (10:45am-12:30pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148