ST9304-CS 900606 (2)TO: Alan D. Ratliff,
City Manager
RE: City of Coppell's a i Beltline
Road within the City Limits of Dallas
The Dallas city limits on East Beltline Road extends from a line
just east of the Grapevine Creek to a line west several hundred
feet from the railroad spur crossing.
Within these boundaries over the past 12 months, the City of
Coppell Street Division has expended budgeted funds and utilized
manpower to perform the following activities:
- Pot hole patching (asphalt, road base)
- Shoulder work (road base)
- Right-of-way mowing (fuel, maintenance, deprecation)
- Trash/debris collection (trash bags, hauling)
- Complaint/administration
An estimate of labor and materials that have been utilized to
maintain this section of road is estimated at $7,000.00, the bulk
of which is mowing.
SGG/sm
cc: Per Birdsall, Street Superintendent