Loading...
MA FY 0001-LR011112Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving, alley behind 620 Phillips St. @ 0'-30' and from edge to edge LOCATION OF POUR SET 2: 12 November 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 1125 Cement Ticket No. 7110627 Flyash Time Batched 9:03am Sand Time Sampled 10:15am in. Concrete Temp. (ASTM C1064) 75°F in. Air Content (ASTM C231) 3.5% Water Unit Weight (ASTM C138) Admix #1 Admix //2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 175 4.50 7 11/19/01 176 4.50 7 11/19/01 177 4.50 14 11/26/01 178 4.50 14 11/26/01 179 4.50 28 12/10/01 180 4.50 28 12/10/01 102,200 3620 103,700 3670 113,500 4010 116,100 4110 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: TMC (9:15am-11:15am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148