Loading...
MA FY 0001-LR011109Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 9 November 2001 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1 ) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf ~ 10.0% Moisture LOCATION PROCTOR LIFT Alley Paving Replacement ~ 616 Phillips 112) 1 O' north of south end 1 113) 10' south of north end 1 114) 25' south of north end 1 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Fin. Sub. 6.8 122.6 98.1 95+ Fin. Sub. 9,5 123.0 98.4 Fin. Sub. 9.9 122.5 98.0 TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148