Loading...
MA FY 0001-LR011107Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO,: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Alley paving behind 306 Edgewood Court LOCATION OF POUR SET 2: 7 November 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. NA Cement Ticket No. 7110441 Flyash Time Batched 9:05am Sand Time Sampled 9:40am in. Concrete Temp. (ASTM C1054) 75°F in. Air Content (ASTM C231) 3.8% Water Unit Weight (ASTM C13e) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1 ~,3) psi Strength 169 6.00 170 6.00 171 6.00 172 6.00 173 6.00 174 6.00 7 11/14/01 90,500 3200 7 11/14/01 89,400 3160 14 11/21/01 99,000 3500 1 4 11/21/01 99,300 3510 28 12/05/01 ll0,000 3890 28 12/05/01 1,[7,000 4,~40 28-Day Average 4020 4000 TECRNICIAN: DISTRIBUTION: RJW (8:45am-10:45am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 7 November 2001 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf @ 10.0% Moisture LOCATION PROCTOR LIFT MOISTURE CONTENT % Alley Paving Replacement @ 300 Lakewood Court 109) approx. 10' east of west end 1 Fin. Sub. 11.0 110) approx. 25' west of east end 1 Fin. Sub. 9.1 111) approx. 5' west of east end 1 Fin. Sub. 7.9 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 120.6 96.5 121.0 96.8 128.3 102.6 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148