Loading...
MA FY 0001-LR011105Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 5 November 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Alley paving behind 528 Kirkland, 20' east to west and 10' north to south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. NA Cement Ticket No. 7110343 Flyash Time Batched 10:15am Sand Time Sampled 10:45am in. Concrete Temp. (ASTM C1064) 74°F in. Air Content (ASTM C2311 4.75% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 163 4.00 7 11/12/01 164 4.00 7 11/12/01 165 4.00 14 11/19/01 166 4.00 14 11/19/01 167 4.00 28 12/03/01 168 4.00 28 1 2/03/01 76,100 2690 84,000 2970 105,300 3720 lll,40Q 3940 129,500 4580 123,900 4380 28-Da¥ Average 4480 4000 TECHNICIAN: DISTRIBUTION: CBC (10:00am-12:00 Noon) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148