MA FY 0001-LR010912CLIENT:
Hooper Engineering Laboratories, Inc.
Nova Construction Co., Inc.
PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076
MATERIAL DESCRIPTION: 1) Cement Treated Base
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
DATE:
ASTM D 698 STANDARD PROCTOR:
1) 125.0 pcf @ 10.0% Moisture
LOCATION PROCTOR LIFT
12 September 2001
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Alley Paving Replacement (~ 741 Robin
77) approx, 20' west of east end 1 Fin. Sub. 8,1 121.3 97.1
78) approx. 75' west of east end 1 Fin. Sub. 7.6 128.1 102.5
79) approx. 20' east of west end 1 Fin. Sub. 6.4 123.9 99.1
95+
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co,, Inc.
(1) City of Coppell
2870 Walnut 'Hill Lane
Dallas, Texas 75229
(214) 351-6419 Fax (214) 351-5148