ST9401-CN 990608 AGENDA REQUEST FORM The City With A Beautiful Future CITY COUNCIL MEETING: June 8, 1999 ITEM # ~- ~ ITEM CAPTION: Consider approval of Change Order #3 to the Denton Tap Road Project #ST94-01 in the amount of $230,520.00 to Rebcon, Inc. for the construction of W. Town Center Drive (2nd High School Access Road); and authorizing the Mayor to sign. APPROVED BY CITY COUNCIL DATE SUBMITTED BY: Kenneth M. Griffin, RE. TITLE: Director of Engineering/Public Works STAFF COMMENTS: In an attempt to expedite the construction of the 2na High School Access Road and at the direction of Council, staff contacted Rebcon, Inc., the contractor currently working on Denton Tap Road, about a change order to their project. Rebcon has been very responsive during the course of the construction of Denton Tap Road and basically has kept the project on schedule. After initial discussion with the representative of Rebcon, Inc., there was an indication that it would be possible to execute a change order such that the 2"a High School Access Road could be completed sometime in early August or possibly before the beginning of the school year. The wall and road humps did add some additional cost to the project, however, from a safety standpoint both of those items have been deemed to be necessary. Staff is currently working with the property owner in finalizing the necessary right-of-way and dealing with the utility companies to bring about the relocations so that the project can proceed. In an attempt to expedite the project and hopefully have it constructed prior to the school year, staff recommends the award of Change Order #3 to Rebcon, Inc. in the amount of $230,520.00 for the construction of the 2~d Access to the High School. Staff will be available to answer questions at the Council meeting. DI . INITIALS: V7 FIN. REVIEW: o Revised 2/99 BUDGET AMT. $ AMT. EST. $ +X-BID $ FINANCIAL C~IENTS: Funds for~xs construction project are available in the Street CIP Account, CITY MANAGER REVIEW: Document Name: #06086 COPPELL, TEXAS 75019 December 2, 1999 P.O. Box 478 CoppelI, Texas 75019 972-462-0022 Mr. Robert C. Bibby REBCON, Inc. 1868 W. Northwest Hwy. Dallas, Texas 75220 Re: 4 originals Change Order #3 (Addition of 2"a High School Access Road Project ST97-04) Denton Tap Road Project # ST 94-01 Dear Mr. Bibby: Enclosed are the executed documents for Change Order #3 which is for the construction of W. Town Center Drive (2~a High School Access Road) project. Please sign and return three originals to me. Thank you, Director of Engineering/Public Works CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: Denton Tap Road Projea # ST 94-01 Rebcon Inc. City of Coppelt CHANGE ORDER NO.: 3 (Addition of 2~ High School Access) Item Description Quantity Unit ADD: I New 1 Uncl Street Excavation 1644.0 CY 2 Controlled Density Fill 112.0 CY 4 ROW Prep 5. 6 STA 16 6" Lime Stab Subgrade 3250.0 SY 17 Lime 49.0 TON 18 8" 300011Reinfi Conc St Pvmt 156.0 SY w/curb 20 4" 300011 Conc Sid~valk 530. 0 SY 28 Re~ 4" White Pvmt Markers 40. 0 EA 32 3" Sch 40 PVC Conduit 90.0 LF 55 Adjust Exist. SS Manhole 2.0 EA ROW Prep 3.5 STA Saw/Rem Conc Curb&Gutter 298.0 LF. Butt Joint 298. 0 LF 6" 300011 Reinfi Conc St. 2832.0 SY Pvmt w/curb Road Humps 2.0 EA Pavestone Retaining Wall 680.0 LF Total Revision to Contract Amount DATE: 6/8/99 Unit Price Total ZOO 11,508. OO 6. OO 672. OO 3,100. OO 17,360. OO 1.50 4,875. OO 92. OO 4,508. OO 30. 00 4, 680. 00 21.OO 11,130. OO 5. 80 232. O0 4. OO 360. OO 500. OO 1,000.00 9,600. OO 33,600. OO Z50 2,235.00 4. OO 1,192.OO 29. OO 82,128. OO $23o,52o. oo Previous contract amount Net increase in contract amotu~t Revised contract amount Net increase in contract time of completion Revised Contract time of completion $3,677,038.15 $ 230,520.00 $3,907,558.15 -0- 290 Working Days Special Conditions: 1. Prices exclude: utility adjustments or relocafiong light pole relocation; grass; irrigation; relocate trees, 2. The Pavestone Wall Unit Price is based on constructing a flex base footing in lieu of a concrete footing. Denton Tap Road Project ST 94-01 Change Order #3 6/8/99 Page 2 The contractor hereby accepts this Contract adjustment as a final and complete adjustment in fu~ accord and satisfaction of a~ past and future liability originating under any clause in the Contract by reason of this revision to the ContracL Recommended .b~iW Engineer Approved by~;ner _tA Dam POINT STA 200,OlY V~ UTIUTY U :G :ND .,~ I_ undergroe n.~ Pat Ceble l ~ Undergr~ i~ AT& _,~ -,., Undelr$ tc Gos ,,_.m~ Undergro~ ~c G.T.E. Cob~ .__.!1,._. Overheed T.J. Line - - Sonltary: ,e r Lbte . ,,,,,,.. ,,. _-,_-_-~-~ HIGH SCHOOL i Z!O' , . :L .>: ', ~/,,., .~ I R CITY OF COPPELL " COPPELL HIGH SCHOOL SOUTH ACCESS ROAD SOU2 REBCON, INC. 1868 W. NORTHWEST HWY. DALLAS, TEXAS 75220 PHONE: 972-444-8230 FAX: 972-444-8234 LETTER OF TRANSMITTAL TO: City of Coppell Engineering Department ATTN: Mr. Ken Griffin ADDRESS: P.O. Box 478 CITY: Coppell STATE: Tx ZIP: 75019 DATE: 12-09-99 JOB NO.: 9809 RE: Denton Tap Road Cottonwood Creek to S.H. 121 Bypass City of Coppell PLEASE BE ADVISED: WE ARE SENDING YOU [] PLANS [] LETTER [] SUB-CONTRACT [] CONTRACT [] SHOP DRAWINGS [] SPECIFICATIONS [] OTHER: [] CHANGE ORDER [] SAMPLES DATE COPIES DESCRIPTION 06-08-99 3 Change Order No. 3 THESE ARE BEING TRANSMITTED AS INDICATED BELOW: [] FOR [] AS [] FOR YOUR USE [] FOR BID (S) DUE APPROVAL REQUESTED [] FOR YOUR [] APPROVED [] RETURNED AFTER [] RETURNED WITH COMMENTS AS IS LOANED TO US CORRECTIONS COMMENTS: SIGNED:/~~__._~ TYPED NAME: ROBERT C. BIBBY