Loading...
MA FY 0001-LR010910Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving, alley behind 463 Clear Creek LOCATION OF POUR SET 2: 10 September 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 0 Cement Ticket No. 7107413 Flyash Time Batched 7:45am Sand Time Sampled 8:35am in. Concrete Temp. (ASTM C1064) 83°F in. Air Content (ASTM C231) 4.3% Water Unit Weight (ASTM c13a) Admix #1 Admix //2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C143) psi Strength 121 5.25 122 5.25 123 5.25 124 5.25 125 5.25 i26 5.25 7 09/17/01 111,300 3940 7 09/17/01 109,800 3880 14 09/24/01 120,00O 4240 14 09/24/01 1.19,600 4230 28 10/08/01 150,200 5310 28 10/08/01 143,100 5060 28-Day Average 4OOO TECHNICIAN: DISTRIBUTION: EWM (7:45am-9:45am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148