MA FY 0001-LR010907Hooper Engineering Laboratories, Inc.
CLIENT:
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
PROJECT:
MATERIAL DESCRIPTION: 1) Cement Treated Base
Nova Construction Co., Inc.
2001 City of Coppell Street & Alley Repair, Job 21076
1) 125.0 pcf (~ 10.0% Moisture
DATE:
MOISTURE DRY PERCENT
LIFT CONTENT DENSITY COMPACTION
% PCF %
ASTM D 698 STANDARD PROCTOR:
LOCATION PROCTOR
Alley Pavinq Replacement (~ 463 Clear Creek
74) approx. 15' west of east end 1
75) approx. 65' west of east end 1
76) approx. 20' east of west end 1
Fin. Sub. 7.2 120.2 96.2
Fin. Sub. 6.6 120.9 96.7
Fin. Sub. 7.4 124.9 99.9
7 September 2001
REQUIRED
COMPACTION
%
95+
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co., Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148