Loading...
MA FY 0001-LR010827Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 27 August 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Alley paving from 950'-1020' north from Woodhurst LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 1040 Cement Ticket No. 7107173 Flyash Time Batched 12:36pm Sand Time Sampled 1:5Opm in. Concrete Temp. (ASTM C1064l 83°F in. Air Content (ASTM c231) 4.7% Water Unit Weight (ASTM c13el Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 115 5.00 116 5.0O 117 5.00 118 5.00 119 5.00 120 5.00 7 09/03/01 89,700 3170 7 09/03/01 93,400 3300 14 09/10/01 105,600 3740 14 09/10/01 108,700 3850 28 09/24/01 126,40.0. 4470 28 09/24/01 121,0Q0 4280 28-Day Average 4380 4000 TECHNICIAN: DISTRIBUTION: CBC (12:30pm-2:30pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 27 August 2001 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf @ 10.0% Moisture 69) 7O) 71) LOCATION PROCTOR LIFT Alley Pavinq Replacement ~ 181 Simmons east end 1 Fin. Sub. Alley Paving Replacement ~) 240 Willow Sprin.qs west end 1 Fin. Sub. east end 1 Fin. Sub. MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 6.4 129.5 103.6 95+ 5.4 130.8 104.6 5.3 126.6 101.3 TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351~6419 Fax (214) 351-5148