Loading...
MA FY 0001-LR010810Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 10 August 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, alley behind 333 Lakewood, from existing concrete to 30' south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 0 Cement Ticket No. 71 06371 Flyash Time Batched 7:58am Sand Time Sampled 8:55am in. Concrete Temp. (ASTM C1064) 89°F in. Air Content (ASTM C231l 4.3% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESS~YE STRENGTH TESTS IASTM C39l (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 91 5.00 7 08/17/01 92 5.00 7 08/17/01 93 5.00 14 08/24/01 94 5.00 14 08/24/01 95 5.00 28 09/07/01 96 5.00 28 09/07/01 106,600 377O 110,400 3900 113,000 4000 114,200 4040 130,300 4610 128,500 4550 28-Day Average 4580 4000 TECHNICIAN: DISTRIBUTION: EWM (8:00am-10:00am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148