Loading...
MA FY 0001-LR010809Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 9 August 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, Bethel School Road at 40'-63' west from Plantation Road, westbound lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 955 Cement Ticket No. 7106294 Flyash Time Batched 11:03am Sand Time Sampled 12:05pm in. Concrete Temp. (ASTM C1064) 91 °F in. Air Content (ASTM C231) 4.0% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM Cl 43) psi Strength 85 5.00 86 5.00 87 5.00 88 5.00 89 5.00 90 5.00 7 08/16/01 1 06,300 3760 7 08/16/01 1 06,600 3770 14 08/23/01 116,500 4120 14 08/23/01 115,900 4100 28 09/06/01 129,400 4580 28 09/06/01 130,0Q0 4600 28-Day Average 4590 4OOO TECHNICIAN: DISTRIBUTION: TMC (11:30am-1:30pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148