Loading...
MA FY 0001-LR010731Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving repair, patch at alley behind residence at 216 Willow Springs LOCATION OF POUR SET 2: 31 July 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 0 Cement Ticket No. 7105762 Flyash Time Batched 10:12am Sand Time Sampled 11:30am in. Concrete Temp. (ASTM C1064) 92°F in. Air Content (ASTM C231) 3.4% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 42 COIV/PRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren,gth 28-Day (ASTM C143) ps1 Strength 73 5.00 7 08/07/01 74 5.00 7 08/07/01 75 5.00 14 08/14/01 76 5.00 14 08/14/01 77 5.00 28 08/28/01 78 5.00 28 08/28/01 95,200 3370 96,600 3420 107,000 3780 109,800 3880 121,100 4280 115,700 409Q 28-Day Average 4190 4000 TECHNICIAN: DISTRIBUTION: TMC (10:45am-12:15pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148