Loading...
MA FY 0001-LR010727Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving patch in alley behind 933 Tupulo LOCATION OF POUR SET 2: 27 July 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 0 Cement Ticket No. 7105632 Flyash Time Batched 3:02pm Sand Time Sampled 3:45pm in. Concrete Temp. (ASTM C1064) 95°F in. Air Content (ASTM C231) 4.1% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS IASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 67 5.00 7 08/03/01 68 5.00 7 08/03/01 69 5.00 14 08/10/01 70 5.00 14 08/10/01 71 5.00 28 08/24/01 72 5.00 28 08/24/01 94,800 3350 101,500 3590 108,700 3840 106,300 3760 130,800 4630 128,300 4540 28-Day Average 4590 40O0 TECHNICIAN: DISTRIBUTION: EWM (2:45pm-4:45pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148