Loading...
MA FY 0001-LR010725Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER'. LOCATION OF POUR SET 1: Alley paving replacement at 102 Creekside LOCATION OF POUR SET 2: 25 July 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 1039 Cement Ticket No. 7105375 Flyash Time Batched 1:11pm Sand Time Sampled 2:1 Opm in. Concrete Temp. {ASTM C1064) 99°F in. Air Content (ASTM C231) 4.0% Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 63 4.00 7 08/01/01 64 4.00 7 08/01/01 65 4.00 28 08/22/01 66 4.00 28 08/22/01 98,900 3500 100,100 3540 123, Q00 4350 128,80Q 4560 28-Day Average 4450 4OO0 TECHNiCiAN: DISTRIBUTION: CDJ (12:30prn-3:00pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148