Loading...
MA FY 0001-LR010719Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO,: CLIENT: Nova Construction Co., Inc. DATE: 19 July 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, alley behind house at 218 Willow Springs Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 1127 Cement Ticket No. 6156191 Flyash Time Batched 1:38pm Sand Time Sampled 2:45pm in. Concrete Temp. (ASTM C1064) 95°F in. Air Content (ASTM C231) 4.4% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39J (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren,gth 28-Day (ASTM C143) psi Strength 53 5.25 7 07/26/01 54 5.25 7 07/26/01 55 5.25 14 08/02/01 56 5.25 14 08/02/01 57 5.25 28 08/16/01 58 5.25 28 08/16/01 91,100 3220 92,600 3280 95,800 3390 95,700 3390 128,400 4540 124,400 4400 28-Day Average 4470 4000 TECHNICIAN: DISTRIBUTION: EWM (2:00pm-4:OOpm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214),351-6419 Fax (214) 351-5148 34) 35) 36) Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing ,REPORT OF IN-PLACE DENSITY TESTS Nova Construction Co., Inc. DATE: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf @ 10.0% Moisture LOCATION PROCTOR LIFT Alley Pavin.q Replacement 225 Simmons north side south side MOISTURE DRY CONTENT DENSITY % PCF 1 Fin. Sub. 9.4 119.3 1 Fin. Sub. 7.4 125.6 1 Fin. Sub. 6.8 119.9 middle 19 July 2001 PERCENT COMPACTION % 95.5 100.5 95.9 REQUIRED COMPACTION % 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148