Loading...
MA FY 0001-LR010718Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: 18 July 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, patchwork, on west side of northbound Royal at 0'-30' north from south existing paving directly across from 404 S. Royal LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 956 Cement Ticket No. Flyash Time Batched 12:32pm Sand Time Sampled 1:20pm in. Concrete Temp. (ASTM C10641 94°F in. Air Content IASTM c231) 4.0% Water Unit Weight (ASTM C138) Admix //1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM Cl 431 psi Strength 47 4.00 7 07/25/01 48 4.00 7 07/25/01 49 4.00 14 08/01/01 50 4.00 14 08/01/01 51 4.00 28 08/15/01 52 4.00 28 08/15/01 97,3O0 344O 100,400 3550 107,400 3800 106,700 3770 120,400 4260 126,000 4460 28-Day Average 4360 4000 TECHNICIAN: DISTRIBUTION: TMC (12:30pm-2:30pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texae 75229 (214) 351-6419 Fax (214) 351-5148 321 Hooper Engineering Laboratories, Inc. CLIENT: PROJ ECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Nova Construction Co,, Inc. 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf L~ 10.0% Moisture DATE: 18 July 2001 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % LOCATION PROCTOR LIFT Alley Pavincl Replacement 21 6 Willow Springs west end middle 1 Fin. Sub. 7.1 1 Fin. Sub. 7.6 1 Fin. Sub. 7.2 east end 122.1 97.7 120.1 96.5 119.7 95.8 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Wslnut Hill Lane Dallss, Texss 75229 (214) 351-6419 Fax (214) 351-5148