Loading...
MA FY 0001-LR010712Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO,: CLIENT: Nova Construction Co., Inc. DATE: 12 July 2001 PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving patch, northbound right lane of Royal Lane, approx. 300' south of Northpoit Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 1042 Cement Ticket No. 7104544 Flyash Time Batched 10:25am Sand Time Sampled 11:00am in. Concrete Temp. (ASTM C1064l 87°F in. Air Content {ASTM C231) Water Unit Weight IASTM C1381 Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 2.8-Day (ASTM C143) psi Strength 41 5.50 7 07/19/01 42 5.50 7 07/19/01 43 5.50 14 07/26/01 44 5.50 14 07/26/01 45 5.50 28 08/09/01 46 5.50 28 08/09/O1 109,600 3880 106,900 3780 112,900 3990 .114,200 4040 124,000 4390 124,600 4410 28-Day Average 4400 4000 TECHNICIAN: DISTRIBUTION: MFM (10:15am-12:15pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas,75229 (214)0351-6419 Fax (214) 351-5148