Loading...
MA FY 0001-LR010628Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving patch at 228 Whispering Hills LOCATION OF POUR SET 2: 28 June 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C10641 in. Air Content (ASTM C231) Water Unit Weight (ASTM C1381 Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM Cl 43) psi Strength 31 7 07/05/01 32 7 07/05/01 33 28 07/26/01 34 28 07/26/01 92,5O0 327O 94,60O 335O 121,400 429Q 121,ZOQ 429Q 28-Day Average 4Z9~ 30O0 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallaa, Texas 75229 (214).351-6419 Fax (214) 351-5148