Loading...
MA FY 0001-LR010625Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving patch at 209 Plantation Drive LOCATION OF POUR SET 2: 25 June 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 955 Cement Ticket No. 7103808 Flyash Time Batched 9:30am Sand Time Sampled 11:00am in. Concrete Temp. IASTM C1064) 94°F in. Air Content IASTM C231) 3.7% Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 25 4.00 7 07/02/01 26 4.00 7 07/02/01 27 4.00 14 07/09/01 28 4.00 14 07/09/01 29 4.00 28 07/23/01 30 4.00 28 07/23/01 115,800 4100 111,400 3940 128,300 4540 126,200 4460 142,000 5020 138,200 4890 28-Day Average 4960 300O NOTE: 4000 psi mix used. 3000 psi required. TECHNICIAN: DISTRIBUTION: RJW (10:15am-12:15pm) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas.75229 (214) 351-6419 Fax (214) 351-5148