MA FY 0001-LR010623Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Nova Construction Co., Inc.
DATE: 23 June 2001
PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076
MATERIAL DESCRIPTION: 1) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf @ 10.0% Moisture
15)
16)
MOISTURE
LOCATION PROCTOR LIFT CONTENT
%
Pavinq Replacement ~ Bethel School
Road and Plantation Drive
east end
west end
1 Fin. Sub. 7.3
1 Fin. Sub. 7.9
DRY PERCENT REQUIRED
DENSITY COMPACTION COMPACTION
PCF % %
120.5 96.4
123.2 98.5
95+
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co., Inc.
(1) City of Coppetl
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148