MA FY 0001-LR010622Hooper Engineering Laboratories, Inc.
Construction Materials Testing
CLIENT:
PROJECT:
_REPORT OF IN-PLACE DENSITY TEST~
Nova Construction Co., Inc. DATE:
2001 City of Coppell Street & Alley Repair, Job 21076
22 June 2001
MATERIAL DESCRIPTION: 1) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 125.0 pcf LD 10.0% Moisture
LOCATION
PROCTOR LIFT
Pavinq Replacement ~ 462 Wales Court
12) south end 1
13) north end 1
Pavin~l Replacement ~ 304 Plantation Drive.
14) east end 1
MOISTURE
CONTENT
%
DRY PERCENT REQUIRED
DENSITY COMPACTION COMPACTION
PCF % %
Fin. Sub. 7.2 128.2 102.6 95 +
Fin. Sub. 7.3 120.6 96.5
Fin. Sub. 7.1 121.1 96,9
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co., Inc.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148