Loading...
MA FY 0001-LR010620Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving replacement at 102 Dobacka Drive LOCATION OF POUR SET 2: 20 June 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Nova Cement Ticket No. 7103565 Flyash Time Batched 8:269m Sand Time Sampled 9:209m in. Concrete Temp. (ASTM C1064) 89°F in. Air Content (ASTM C231) 4.5% Water Unit Weight (ASTM C139) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM 039) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 13 4.50 7 06/27/01 14 4.50 7 06/27/01 15 4.50 14 07/04/01 16 4.50 14 07/04/01 17 4.50 28 07/18/01 1 8 4.50 28 07/18/01 121,100 4280 119,000 4210 124,100 4390 134,0Q0 4740 139,700 4930 139,40.0 4940 28-Day Average 4940 40O0 TECHNICIAN: DISTRIBUTION: CDJ 18:00am-lO:3Oam) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, .Texas 75229 (214).351-6419 Fax (214) 351-5148