MA FY 0001-LR010619Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Nova Construction Co., Inc.
DATE: 19 June 2001
PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076
MATERIAL DESCRIPTION: 1) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 125.0pcf @ 10.0% Moisture
6)
7)
8)
LOCATION PROCTOR LIFT
Pavinq Replacement (~ 102 Dobecka
south side 1
north side 1
south side RETAKE 1
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Fin. Sub. 9.6 111.0 88,8*
Fin. Sub. 10.5 121.5 97.2
Fin. Sub. 9.7 121.3 97.0
95+
*Test results indicate fill is not compacted to required density/moisture. Contractor notified.
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Nova Construction Co., Inc.
(1) City of Coppell