Loading...
MA FY 0001-LR010619Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Nova Construction Co., Inc. DATE: 19 June 2001 PROJECT: 2001 City of Coppell Street & Alley Repair, Job 21076 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 125.0pcf @ 10.0% Moisture 6) 7) 8) LOCATION PROCTOR LIFT Pavinq Replacement (~ 102 Dobecka south side 1 north side 1 south side RETAKE 1 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Fin. Sub. 9.6 111.0 88,8* Fin. Sub. 10.5 121.5 97.2 Fin. Sub. 9.7 121.3 97.0 95+ *Test results indicate fill is not compacted to required density/moisture. Contractor notified. TECHNICIAN: DISTRIBUTION: CDJ (1) Nova Construction Co., Inc. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148