Loading...
MA FY 0001-LR010618Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Nova Construction Co., Inc. PROJECT: 2001 City of Coppell Street & Alley Repair LOCATION OF POUR SET 1: Street repair at 256 Willow Springs LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: 18 June 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Nova Cement Ticket No. 7103381 Flyash Time Batched 8:05am Sand Time Sampled 8:58am in. Concrete Temp. {ASTM C1064} 89°F in. Air Content (ASTM C231) 2.6% Water Unit Weight (ASTM C13a) Admix #1 Admix #2 AEA 42 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 7 4.75 7 06/25/01 8 4.75 7 06/25/01 9 4.75 14 07/02/01 10 4.75 14 07/02/01 11 4.75 28 07/16/01 12' 4.75 28 07/16/01 115,600 4070 115,900 4100 120,700 4270 122,300 4330 152,900 5410 147,600 5220 28-Day Average $320 4000 TECHNICIAN: DISTRIBUTION: RDG (8:30am-10:30am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148