Loading...
MA FY 0001-LR010614Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Nova Construction Co., Inc. DATE: PROJECT: 2001 City of Coppell Street & Alley Repair SUPPLIER: LOCATION OF POUR SET 1: Paving, 12'x24' in front of 526 Shadow Crest LOCATION OF POUR SET 2: 14 June 2001 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 42 Truck No. 336 Cement Ticket No. 6152953 Fiyash Time Batched 7:50am Sand Time Sampled 8:55am in. Concrete Temp. IASTM C1064) 85°F in. Air Content (ASTM C231) 3.7% Water Unit Weight (ASTM C1381 Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 1 4.00 7 06/21/01 2 4.00 7 06/21/01 3 4.00 14 06/28/01 4 4.00 14 06/28/01 5 4.00 28 07/12/01 6 4.00 28 07/12/01 112,600 398O 106,600 3770 119,800 4240 124,300 4400 132,20Q 4680 126,000 4460 28-Day Average 4570 4OOO TECHNICIAN: DISTRIBUTION: EWM (7:45am-9:45am) (2) Nova Construction Co., Inc. (1) City of Coppell, Garreth Campbell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148