SS9901-SP020417972 735 3002
APR 17 2002 10:51 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723043570 P.01iO4
TurnerCollieOBraden Inc.
Engineers • Planners • Project Managers
FAX COVER SHEET
17300 Dallas Parkway, Suit,! 1010
Dallas, Tcxas 75: -;4
(97,2) 735 -3000
Fax(9
To: c, h
From: --�
Fax No.:
Number of Pages: c�
Including
Date: I�
Cover)
Subject:
I I
i
t
1
If Transmittal Does Not Come Through
Clearly, Please Call (972) 735 -3000
TEXAS AUSTINIDALLAS/FORT WORTH/HOUSTONIPHARR/SAN ANTONIO COLORADO DENVER
PENNSYLVANIA PHILADELPHIA FLORIDA MIAMI WASHINGTON, D.C.
APR 17 2002 10:51 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723043570
SECTION 02616
DUCTILE IRON PIPE (SEWER SERVICE)
PART 1 GENERAL
1.01 SUMMARY
P. 02104
This Section includes furnishing all labor, tools, equipment, materials, and supplies for
the installation of Ductile Iron Pipe for Sewer Service.
1.02 RELATED REQUIREMENTS
Trench excavation and backfill to be per the requirements of The North Central Texas
Standard Specifications for Public Works Construction Specification Item 6.7 —
Underground Conduit Installation.
1.03 REFERENCES
The publications listed below form a part of this Specification to the extent referenced.
The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM A746 Standard Specifications for Ductile Iron Gravity Sewer Pipe
AMERICAN WATER WORKS ASSOCIATION (AWWA)
ANSVAWWA C104/A21.4
ANSI/AWWA C105/A21.5
ANSI/AWWA C1 I I /A21.11
ANSI/AWWA C151/A21.51
1.04 -1.05 (NOT USED)
1.06 SUBMITTALS
Cement -Mortar Lining for Ductile Iron Pipe and
Fittings for Water (First Edition).
Polyethylene Encasement for ductile Iron Pipe
Systems.
Rubber - Gasket Joints for Ductile Iron Pressure Pipe
and Fittings (Second Edition).
Ductile Iron Pipe, Centrifugally Cast, for Water or
Other Liquids.
Submit affidavit of compliance per the requirements of AWWA C151 and in
accordance with The North Central Texas Standard Specifications for Public Works
Construction Specification Item 1.28 — Shop Drawings, Product Data & Samples.
APR 17 2002 10:51 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723043570 P.03iO4
1.07 QUALITY ASSURANCE (NOT USED)
1.08 DELIVERY STORAGE AND HANDLING
Pipe to be shipped in accordance with the pipe manufacturer's recommendations and
stored in a manner that the pipe is not damaged. The Contractor will replace damaged
piping at no additional cost to the OWNER.
1.09 -1.11 (NOT USED)
PART 2 PRODUCTS
2.01 MANUFACTURER($) (NOT USED)
2.02 MATERIALS AND /OR EQUIPMENT
A. Piping
1. Piping to conform to the requirements of ASTM A746 and AWWA C111 and
C151.
2. Unless otherwise shown on PLANS, piping 4 inches and smaller to be Class 51,
and piping 6 inches through 30 inches to be Class 50 as specified with AWWA
C151.
B. Joints and Gaskets
To conform to ASTM A746 and AWWA C151 for rubber gasketed, push on joints.
C. Coatings
1. Pipe exterior to be bituminous coated and in accordance with the requirements
of AWWA 0151 Section 4.3.
D. Lining
1. Interior lining for ductile iron sewer pipe shall conform to manufacturer's
recommendations.
2. Minimum lining thickness shall be 40 mils, regardless of material
recommended.
3. Acceptable lining materials are:
a. "PolybondPlus" by American Cast Iron Pipe Co.
b. Protecto 401 Ceramic Epoxy by Vulcan Group.
APR. 17 2002 10:51 FR TURNER COLLIE& BRADEN972 735 3002 TO 99723043570 P.04iO4
E. Encasement
Underground Ductile Iron Pipe and Fittings are to be encased according to
provisions of AWWA C105 when specified or as shown on PLANS.
PART 3 EXECUTION
3.01 GENERAL (NOT USED)
3.02 ERECTION/INSTALLATION /APPLICATION AND /OR CONSTRUCTION
Installation of the ductile iron pipe and appurtenances to be in accordance with The
North Central Texas Standard Specifications for Public Works Construction
Specification Item 6.7 — Underground Conduit Installation, and/or as shown on
PLANS.
3.03 - 3.10 (NOT USED)
3.11 MEASUREMENT AND PAYMENT
No separate measurement or payment to be made for work being performed under this
Section but to be included with the of The North Central Texas Standard Specifications
for Public Works Construction Specification Item 6.7 — Underground Conduit
Installation Specification.
END OF SECTION